°Ù¶È¿Õ¼ä | °Ù¶ÈÊ×Ò³ 
 
²é¿´ÎÄÕÂ
 
ůͨרҵӢÓï
2008-08-18 17:04

Ò» ½à¾»ÊÒ Ö÷É豸Main equipment 1 µ¥ÈËË«´µ·çÁÜÊÒSingle head slow room(double jet) 2 ´«µÝ´°Transfer windows 3 µ¥¿ªÃÅOne direction door 4 Ë«¿ªÃÅ

Double direction door 5 Ë«¿ªÃÅDouble direction door 6 Ë«¿ªÃÅDouble direction door 7 Ë«Ãæ²Ê¸ÖÅÝÄ­°å 8 »·ÑõÊ÷Ö¬µØÃæ 9 ʯ¸à°åÌ컨plasterboard

ceiling 10 ÎÀÉú¼äÂÁ¸ô¼äAluminum seperation 11 ²£Á§´°glazing 12 жѹ·§Depressure valve 13 ½à¾»ÊÒ°²×°ÂÁ²ÄAluninum accessaries in clean room С

¼Æsubtotal
¶þ É豸°²×°equipment Assembly 1 µ¥ÈËË«´µ·çÁÜÊÒ°²×°¹¤·Ñ 2 Ë«Ãæ²Ê¸ÖÅÝÄ­°å°²×°·Ñ 3 ʯ¸àÌ컨°å°²×°·Ñ 4 ÂÁ¸ô¼ä°²×°·Ñ 5 »·ÑõÊ÷Ö¬µØÃæ°²×°·Ñ 6 ´«µÝ´°

°²×°¹¤·Ñ 7 жѹ·§°²×°¹¤·Ñ 8 É豸ÃŰ²×°¹¤·Ñ 9 ²£Á§´°°²×°¹¤·Ñ 10 É豸°²×°¸¨²Ä 11 É豸µõÔË·Ñtrasportation 12 ÂÁ²Ä°²×°¹¤·Ñ С¼Æsubtotal 1 Ë®Àä¹ñ

»ú»ù´¡Chiller unit 2 Ë®Àä¹ñ»ú°²×°¹¤·ÑChiller asembly 3 ÀäÈ´Ë®Ëþ»ù´¡ 4 ÀäÈ´Ë®Ëþ°²×°¹¤·Ñ 5 ÀäÈ´Ë®±Ã»ù´¡ 6 ÀäÈ´Ë®±Ã°²×°¹¤·Ñ 7 ÅÅÆøÉȰ²×°¹¤·Ñ 8

¼Óѹ·ç¹ñµõ¼Ü 9 ¼Óѹ·ç¹ñ°²×°¹¤·Ñ 10 É豸°²×°¸¨²Ä 11 É豸µõÔË·Ñ Ð¡¼Æsubtotal
Èý ¿Õµ÷²¿·ÖAir conditioning section 1 Ë®Àä¹ñ»ú 2 ¼Óѹ·ç¹ñ 3 ÀäÈ´Ë®Ëþ 4 ÀäÈ´Ë®±Ã 5 ÅÅÆøÉÈ Ð¡¼Æsubtotal ˮϵͳWater system 1 ¶ÆÐ¿¸Ö¹Ü Zinc

plated steel piping 2 ¶ÆÐ¿¸Ö¹Ü Zinc plated steel piping 3 ·ÀÕðË«ÇòÈí½ÓÍ·Virbrate free double poles terminal 4 Í­Õ¢·§Blass stop valve 5 Í­Õ¢·§

Blass stop valve 6 YÐ͹ýÂËÆ÷ 7 µ¥ÏòÖ¹»Ø·§One way stop peturn valve 8 ζȱí 9 ѹÁ¦±í 10 Ë®¹ÜµõÖ§¼ÜWater piping fittings 11 Åä¹Ü¹¤·ÑPiping

asembly 12 ·§Ãż°Åä¼þ°²×°¹¤·ÑValve and sub-asembly handing 13 ˮϵͳ¸¨²ÄPiping accessaries 14 Ë®Àä¹ñ»úÅÅË®¼°ÅäÁÏChiller accessaries С¼Æ

subtotal
ËÄ ·çϵͳAir system 1 ¶ÆÐ¿°åZinc plated plate 2 ¶ÆÐ¿°åZinc plated plate 3 ¸ßЧ¹ýÂËÆ÷ËÍ·ç¿Ú 4 зç·ÀÓê°ÙÒ¶ 5 »Ø·ç°ÙÒ¶Return air flame plate 6

·çÁ¿µ÷½Ú·§ 7 »Ø·ç°ÙÒ¶Return air flame plate 8 »Ø·ç°ÙÒ¶Return air flame plate 9 »Ø·ç°ÙÒ¶Return air flame plate 10 ÖÐЧ¹ýÂËÆ÷ 11 ÖÐЧ¹ýÂËÆ÷ 12

»Ø·çÏä 13 ³õЧ¹ýÂËÆ÷ 14 ·çÁ¿µ÷½Ú·§ 15 ·«²¼½ÓÍ·Canvas connecting termingal 16 PEF±£Î°åHeat seal 17 ±£Î½ºË®Heat sealent 18 ·ç¹ÜµõÖ§¼Ü 19 ·çϵ

ͳ°²×°¸¨²Ä 20 ·§Ìå¼°¹ýÂËÆ÷°²×°¹¤·Ñ 21 ·ç¹ÜÖÆ×÷°²×°·Ñ 22 ·ç¹Ü±£Î°²×°·Ñ С¼Æsubtotal
Îå µç¿Ø¼°ÆäËû 1 Ë®Àä¹ñ»ú¿ØÖƵçÏä 2 ¼Óѹ·ç¹ñ¿ØÖƵçÏä 3 ²»Ðâ¸ÖµÆÅÌ 4 ¾»»¯µÆ¾ß 5 ÆÕͨÈÕ¹âµÆ 6 Ó¦¼±µÆ 7 ²å×ù¡¢¿ª¹Ø 8 µçÏß²Û¼ÜWire fitting 9 µçÏß

²Û¼Ü 10 µçÀÂÏß 11 µçÏßWire 12 µçÏß 13 µçÏß 14 µÆ¾ß°²×°¹¤·ÑLighting asembly handing 15 µçÏ߲ۼܰ²×°ÖÆ×÷¹¤·ÑWire asembly handing 16 µçÏ߼ܽӹ¤

·Ñ Wire fitting connection 17 É豸°²×°¸¨ÁÏSystem accessaries 18 µõÔË·Ñ Hoisting and transfortation 19 ϵͳµ÷ÊÔ·ÑSystem testing С¼Æsubtotal

²»º¬Ë°¹¤³ÌÔì¼Û
Áù ˰½ð6% TAX ¹¤³Ì×ܼƣ¨º¬Ë°£©TAX included£º

air handling unit ¿Õµ÷Ïä air conditioning load¿Õµ÷¸ººÉ

air distributionÆøÁ÷×éÖ¯ air handling unit ¿ÕÆø´¦Àíµ¥Ôª

air shower ·çÁÜÊÒ

air wide pre.drop¿ÕÆø²àѹ½µ

aluminium accessaries in clean room ½à¾»ÊÒ°²×°ÂÁ²Ä

as-completed drawing Ð޸Ŀ¢¹¤Í¼

layout Éè¼ÆÍ¼

blass stop valve Í­Õ¢·§

canvas connecting termingal ·«²¼½ÓÍ·

centigrade scale ÉãÊÏζÈ

chiller accessaries Ë®Àä¹ñ»úÅÅË®¼°ÅäÁÏ

chiller asembly Ë®Àä¹ñ»ú°²×°¹¤·Ñ

chiller unit Ë®Àä¹ñ»ú»ù´¡

clean bench ¾»»¯¹¤×÷̨

clean class ½à¾»¶È

clean room ½à¾»ÊÒ ÎÞ³¾ÊÒ

correction factorÐÞÕýϵÊý

dcc dry coll units ¸ÉÅ̹Ü

district cooling ÇøÓò¹©Àä direct return systemÒì³Ìʽϵͳ

displacement ventilationÖû»Í¨·ç drawn No.ͼºÅ

elevationÁ¢ÃæÍ¼

entering air temp½ø·çÎÂ¶È entering water temp½øË®ÎÂ¶È fahrenheit scale »ªÊÏζÈ

fan coil unit ·ç»úÅ̹Ü

ffu fan filter units ·çÉȹýÂËÍø×é final Ê©¹¤Í¼

flow velocity Á÷ËÙ

fresh air supply з繩¸ø

fresh air unit з紦Àíµ¥Ôª

ground source heat pumpµØÔ´ÈȱÃ

gross weight Ã«ÖØ

heating ventilating and air conditioning ¹©ÈÈͨ·çÓë¿ÕÆøµ÷½Ú

hepa high efficiency particulate air ¸ßЧ¹ýÂËÍø

high efficiency particulate air filters¸ßЧ¿ÕÆø¹ýÂËÆ÷

horizontal series typeˮƽ´®ÁªÊ½

hot water supply systemÉú»îÈÈˮϵͳ

humidity ʪ¶È

hydraulic calculationË®Á¦¼ÆËã

isometric drawingÖá²âͼ

leaving air temp ³ö·çÎÂ¶È leaving water temp³öË®ÎÂ¶È lood vacuum pumpÖÐÑ뼯³¾±Ã


Àà±ð£ºÄ¬ÈÏ·ÖÀà | Ìí¼Óµ½ËÑ²Ø | ·ÖÏíµ½iÌù°É | ä¯ÀÀ() | ÆÀÂÛ (1)
 
×î½ü¶ÁÕߣº
 
ÍøÓÑÆÀÂÛ£º
1
2009-04-22 21:10 | »Ø¸´
ºÃ¶«Î÷
¾ÍÊÇÄÚÈÝÌ«ÉÙ
ûÓб༭
 
·¢±íÆÀÂÛ£º
ÐÕ¡¡Ãû£º
ÍøÖ·»òÓÊÏ䣺 (Ñ¡Ìî)
ÄÚ¡¡ÈÝ£º
ÑéÖ¤Â룺 Çëµã»÷ºóÊäÈëËÄλÑéÖ¤Â룬×Öĸ²»Çø·Ö´óСд
      

     

©2009 Baidu