您正在查看 "Iso 17025" 分类下的文章 2010-01-21 16:33
UL unveiled the SMT Assessment and Supervision Program to help electrical and electronic manufacturers in the Greater China region expedite the “go-to-Global-market” process yet enhance their staff competence and product quality.
|
2010-01-13 11:56
ISO/IEC 17025 accreditation should be well thought out and well prepared. It can be quite expensive but can also have big benefits. The balance between costs and benefits should be worked out and documented.
Going for ISO/IEC 17025 will impact the entire laboratory and supporting services such as human resources, documentation and finance departments. Therefore, while th |
2010-01-13 11:54
Now that you have an overview on required management and technical controls we will give recommendations on how to efficiently comply with some key requirements. The scope of this tutorial does not allow going into all the details and we cannot cover all requirements. We will focus on topics which most likely are new to laboratories without a quality system. These include: specific organizatio
|
2010-01-13 11:52
Technical requirements address the competence of staff, sampling and testing methodology, equipment and quality and reporting of test and calibration results. This chapter is divided into ten sections.
General
The technical requirements part starts with a general chapter. It makes readers aware of the fact that the correctness and reliability of test and calibration re |
2010-01-13 11:50
Management requirements are related to the operation and effectiveness of the quality management system within the laboratory and has similar requirements to ISO 9001. This part is divided into fifteen chapters.
Organization
This chapter ensures that the roles and responsibilities of the laboratory, the management and key personnel are defined.
Ke |
2010-01-13 11:45
Companies have to continuously deliver high-quality products and/or services if they want to be successful in the marketplace in the long term. Quality improvement has become a key national and international business strategy. Most companies are using quality systems as a method of assuring the consistent conformity of products or services to a defined set of standards or customer expectations.
|
2010-01-12 21:48
1. Management Summary
ISO/IEC 17025 is a quality standard for testing and calibration laboratories. The current release was published in 2005. There are two main sections in ISO/IEC 17025 - Management Requirements and Technical Requirements. Management requirements are related to the operation and effectiveness of the quality management system within the laboratory and has similar requirements to ISO 9001. Technical requirements addr
|
2010-01-12 19:25
During the assessment, does my laboratory have to have at least one piece of M&TE available for demonstration for each test/measurement on our Scope of Accreditation? What if my laboratory uses rental equipment to perform tests/measurements on our Scope…Would we be required to have at least one piece of this rental equipment available for demonstration for each test/measurement that the rental equipme |
2010-01-12 19:25
Is this section applicable to a laboratory's internal auditor? 01/26/2006
5.2
Since a laboratory's internal auditor is responsible for examining various aspects associated with equipment, |
2010-01-12 19:22
What is the difference between a request, a tender and a contract? 04/30/2005
4.4
Requests, tenders and contracts are three different activities. Initially, a request is received from the client for a scope of work. The lab, in response, makes a tend |
2010-01-12 19:21 A2LA Specific Applications of Additions to the Standard
ISO/IEC 17025 often uses the words “calibration and testing” in describing requirements. How do laboratories that only perform one or the other interpret those requirements? 04/30/2005
1.2
ISO/IEC 17025 covers |
2010-01-08 19:31 The 11th General Conference on Weights and Measures ( 1960) adopted the name Système International d'Unités (International System of Units, international abbreviation SI), for the recommended practical system of units of measurement.
The 11th CGPM laid down rules for the prefixes, the derived units, and other matters. The base units are a choice of seven well-d |
2010-01-08 15:44 The calibrations and measurements made by SCL are metrologically traceable to the International System of Units (SI). SCL has set up primary measurement standards in some of its measurement fields. Primary measurement standards may be primary realisations of the SI units or agreed representations of the SI units based on fundamental physical constants. These primary measurement standards provide the ultimate metrological traceability t |
2010-01-08 15:29
The national measurement system is a coherent formal system which ensures that measurements can be made on a consistent basis throughout the country. It ensures that practical measurements made by industry and the community are linked to the International System of units (SI units).
Australia has a well-developed national measurement system which is made up of four national organisations which are compl |
| | |